Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 21 results ...

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects, Unpublished PhD Thesis, , Oklahoma State University.

Alroomi, A S (2013) Integrative framework for sustainable development of the cost estimating profession, Unpublished PhD Thesis, , Oklahoma State University.

Brown, B H J (1974) An econometric forecasting model for a segment of the construction market, Unpublished PhD Thesis, , Oklahoma State University.

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates, Unpublished PhD Thesis, , Oklahoma State University.

Eldin, N N (1987) Methodology for project management control in the construction industry, Unpublished PhD Thesis, , Oklahoma State University.

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time, Unpublished PhD Thesis, , Oklahoma State University.

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment, Unpublished PhD Thesis, , Oklahoma State University.

Johnson, L R (1969) A competitive strategy model for highway construction proposals, Unpublished PhD Thesis, , Oklahoma State University.

  • Type: Thesis
  • Keywords: competitive strategy; construction project; highway; bidding
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/288171277
  • Abstract:
    [Extract from Preface] A contractor bidding on highway construction projects faces two conflicting objectives: first to be the low bidder so as to win the project, and second, to earn as high a profit as possible. The conflict is apparent because the higher the contractor bids, the more profit is realized, but the less likely he is of being the low bidder. The submitted bid will be a compromise between these two objectives, and will be based both on the contractor's cost experience with similar projects and his knowledge of the industrial environment at that time. Models are developed in this dissertation to aid the contractor in making his decisions when bidding for paving projects. These models involve the development of a distribution of low bids which can be expected for a specific project, based on the required work items. From this distribution and the estimated cost of the project, the optimum bid, maximizing the expected profit, is determined.

Karimi, B (2018) Evaluation of emissions reduction strategies for heavy duty diesel construction equipment, Unpublished PhD Thesis, , Oklahoma State University.

Kim, J (2022) A multimodal approach to improve fire safety on construction sites, Unpublished PhD Thesis, , Oklahoma State University.

King-Lewis, A (2020) Diversity and inclusion of women in the construction industry, Unpublished PhD Thesis, , Oklahoma State University.

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities, Unpublished PhD Thesis, , Oklahoma State University.

Lusby, A K (2003) The effect of increased public investment in transportation infrastructure on oklahoma's economic development, Unpublished PhD Thesis, , Oklahoma State University.

Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs, Unpublished PhD Thesis, , Oklahoma State University.

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings, Unpublished PhD Thesis, , Oklahoma State University.

Shararah, H H (1981) Evaluation of wall construction techniques based upon economical factors influencing labor and materials, Unpublished PhD Thesis, , Oklahoma State University.

Spencer, G R (1987) Integration of cost estimating with critical path scheduling, Unpublished PhD Thesis, , Oklahoma State University.

Syachrani, S (2010) Advanced sewer asset management using dynamic deterioration models, Unpublished PhD Thesis, , Oklahoma State University.

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation, Unpublished PhD Thesis, , Oklahoma State University.

Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry, Unpublished PhD Thesis, , Oklahoma State University.

Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction, Unpublished PhD Thesis, , Oklahoma State University.